Year Lifespan
Installs
Upfront Savings

For too long, the wastewater industry has relied on outdated precast concrete manholes. They’re costly to install, difficult to maintain, hazardous for workers, and inefficient for municipalities.
The Poo Pit has disrupted the status quo with a brand new, cost-effective, and safe way to access sewers that can be installed in as little as 15 minutes.
Access from the Surface
Provided with a 12” PVC SDR35 riser pipe stub, which allows access for flushing, camera and jetting. Depending on depth, simply add additional lengths of pipe to reach desired grade.
Reinforced Base
Adding additional strength for install depths up to 25’.
Fully Customizable Inlets
Available in 6”–12” inlet sizes. Multiple inlets can be cored into any structure at any angle, grade, or slope to meet project requirements. Inquire about additional applications and sizes.
Polyethylene Body
Durable, rotomolded, polyethylene body. Lightweight and corrosion, impact and chemically resistant.
Fully Customizable Outlets
6”–12” injection-moulded spigots are available and can be designed to drawings at any angle, grade, or slope on the pit body. The outlet is moulded at the bottom center at 0%.




.jpg)





.jpg)





.jpg)


A modern way to access sewers, eliminating confined space entry.

The larger version of the Poo Pit, equipped with a 24" full polyethylene riser

The largest version of the Poo Pit, used when manned-access is still required.
We provide engineered specs, real-world case studies, and compliance documentation to simplify approvals.

Work with our team for implementation, making sure it fits your needs.

See reduced maintenance, lower costs, and see a smoother collection system in action.



Total Savings
$89,761
Curious to learn how much the Poo Pit could save you? Add your project specs to our calculator and see for yourself why municipalities across the country are calling this the “future of manholes.”