You are putting infrastructure in the ground that is expected to serve a neighborhood, a municipality, or a development for decades. The roads above it will be repaved. The buildings around it will be renovated. The residents it serves will raise families and grow old, and that manhole will still be there.

So why are so many contractors and municipalities still choosing a material that begins degrading the day it goes into the ground?

Concrete Was Never Designed to Last Forever
Precast concrete manholes have been the industry default for over a century, but longevity in the market is not the same as longevity in the field. Concrete is porous. It absorbs moisture. It is vulnerable to hydrogen sulfide corrosion from gases that naturally occur in wastewater systems. Over time, it cracks. It leaks. It allows groundwater infiltration and sewage exfiltration, the very issues it was designed to prevent.

The result is manholes that require inspection, patching, lining, and eventually full replacement on a timeline measured in years rather than decades. For a system that is meant to function as permanent infrastructure, this creates a fundamental mismatch.

The cost is not just financial. It impacts operations, system capacity, and long term planning, says Daryl, founder of Poo Pit. What stands out most is how aligned these conversations are. Engineers want confidence in performance. Public works leaders want systems that simplify installation and reduce long term risk. Contractors want something that installs cleanly and does not create future problems. The Poo Pit was designed to meet all of these needs.

What Long Term Performance Actually Requires
Polyethylene does not corrode. It does not absorb moisture. It does not react to hydrogen sulfide the way concrete does. The Poo Pit is fully sealed and manufactured from high density polyethylene, a material engineered for harsh, chemical heavy wastewater environments.

When you specify a Poo Pit, you are not making a tradeoff to save time on installation. You are making a stronger long term decision for the system, the municipality, and the residents who rely on it.

Permanent infrastructure deserves a permanent solution. The choice of material is not just a procurement decision. It is a commitment to how long the system will perform without creating future issues.

The Real Question for Engineers and Municipalities
If you knew a manhole would require significant maintenance or replacement within 15 to 20 years, would you still specify it for infrastructure designed to last 50 years? Most would not, yet that is the reality many projects face without fully recognizing it.

The Poo Pit changes that equation. It offers faster installation, eliminates the need for confined space entry, and delivers a material profile designed to outlast the systems it supports, not just the warranty period.

Infrastructure decisions made today will remain in the ground long after the installation crew has retired. Choose the solution that will perform.

Ready to specify the Poo Pit for your next project? Contact our team.

Ready to join the Pit Crew?

Pilot the Poo Pit